Developers & multiplex

Buy your units online, to the dollar and to the date.

The Modulabs multiplex, for those who develop: you configure, you see the total cost per unit, you see the delivery date of every building, and you buy — land included — in one place.

The same purchase, at the scale of your project.

One unit or several, the transaction does not change: the price you see covers the building, the land, the foundation, the hookups, transport, taxes and rebates. Zoning, servicing and delivery access are verified before you commit, and the delivery date is written into the contract. You close your pro forma on numbers that will not move.

Configure my project
1
transaction, instead of sixteen parties
30 d
of assembly per building
30%
up to, in savings vs a traditional job site

Capacity, in numbers

What you can put in the pro forma.

300+Homes delivered per year
600+Multiplex units per year
150,000 sq ftQuebec factory in 2027
30 dAssembly per building

The eight steps

From the first lot you target to delivery.

The same eight-step path, tracked unit by unit, in one file instead of sixteen.

Steps 1 and 2

Define, then locate

You set the program, the budget per unit and the area. We show you the lots that can take the unit count you are targeting, and the models that can physically be delivered to them.

Steps 3 and 4

Prepare, then confirm

You configure each building and watch the total cost per unit form with every choice. Zoning, servicing, delivery access and financing are confirmed before you commit, not after you have acquired the land.

Steps 5 and 6

Buy, then track

You buy online, land included: the price per unit is settled and the delivery dates are written. You then track factory fabrication, permits and site preparation from the same file.

Steps 7 and 8

Adjust, then close

Any change shows its effect on cost per unit and on date before you authorize it. At delivery: inspection, possession, warranties activated and rebates claimed.

Two ways to buy

Sixteen parties per project, or one transaction.

For a developer, the gap is measured in files you have to carry, dates that hold, and a cost per unit that does not move.

The buying experience On modulabs.ca The usual route
Who you deal with one transaction, land included sixteen parties to coordinate per project
Cost per unit total cost per unit, shown before you buy a starting price, then change orders
Delivery dates written into the contract, building by building estimated, then revised mid-build
Lots zoning, servicing and delivery access verified before commitment constraints discovered after acquisition
Fabrication about 45 days in the factory, then 30 days of assembly a job site exposed to weather and labour supply
Standards CAN/CSA-A277, CSA, RBQ, plans signed by an engineer (OIQ) depends on the contractor

Configure your project and buy online.

The configurator returns the total cost per unit and the delivery date of every building for the lots you selected. If you want an area or a structure checked before you commit, leave us your details.

You can buy without ever talking to us. The price per unit and the dates are in the configurator.